My Music Video

My Outside Digipak Panels

My Outside Digipak Panels

My Inside Digipak Panels

My Inside Digipak Panels

Please click the image below to view our finished website

Wednesday 1 February 2017

R+P Post 14: Our filming arrangements

So that we all knew what we were going to be doing and that there was no confusion and unnecessary stress, it was important that we made concrete plans to stick to for the shoot day.

We ensured this by each having a copy of the necessary details such location, timing, props needed and equipment release forms all of which can be seen below.

The test shoot filming arrangements
The arrangements we made were:
  • Shoot time - 9:00 - 4:00
  • Location - my house
  • One actor - who we messaged all the details to the week before and reminded the day before

We also created a shootboard using pictures from our storyboard to ensure that we got everything we needed on the day ad to keep us organised. Before making the final document we sat down as a group and decided which shots had similar set ups and so should be shot together, any extra master shots we wanted to put in and roughly how long each shot would take to complete.

Out shootboard included:
  • the timings for each shot
  • the shot number
  • a picture of the actual shot
  • framing and camera movement
  • actors
  • props
  • crew roles
Below is a prezi showing the pages of our shootboard

No comments:

Post a Comment